When submitting to obtain Septic/Onsite Wastewater Treatment System (OWTS) approval from DEH for your proposed new development building project, please provide the following:

     1. A completed Land Use Service Application

     2. One (1) copy of site plan with proposed location(s) for Septic/OWTS to scale (1" = 20') 

     3. Septic/OWTS Feasibility must be determined by completion of the following:
          a. Site assessment
          b. Soil analysis
          c. Percolation testing (completed by REHS, Professional Civil Engineer, or Professional
          Geologist)
          d. Approved water supply (well/public water)

Once Septic/OWTS Feasibility is determined, a proposed Septic/OTWS design must be submitted for review. Submittal should include the following: 

     4. One (1) copy of proposed Septic/OWTS design to scale (1” = 20’). 
          a. Plans/Design must comply with all items listed on the Plan Submittal Requirements checklist.
          b. If secondary dwelling – location of existing septic tank and leachfield (As-built)

     5. Once all requirements have been completed and plans are ready for an approval stamp,  
     additional copies (4) will need to be submitted.

After plans are reviewed and approved by DEH, you will need to take three (3) stamped plans to the applicable jurisdiction’s Planning/Building Department for inclusion in the building packet. The Septic/OWTS Permit will be issued with the issuance of the building permit prior to the start of Septic/OWTS construction.

NOTE: All applicable fees must be paid in full prior to any services provided by DEH (inspections, plan reviews, approvals, etc.). Additional fees and requirements may apply. Projects/Submittals are reviewed in the order received.

Image of a yard showing an exposed septic wastewater treatment system

Applicable fees:

PE

 Amount  

  Description

SEPTIC/OWTS FEASIBILITY:

LU01

$615

  Site Assessment

LU02

$615

  Soil Analysis

LU06

$894

  Percolation tests (up to 6 holes) 

PLAN REVIEW:

LU08

$336

  Geological Technical Report Review (if slope >20%)

LU13

$1006

  Land Use Plan Check: Commercial Construction

LU14

$559

  Land Use Plan Check: New Residential Construction

LU18

$223

  Land Use Plan Check: Resubmittal

LU19

$1006

  Land Use Plan Check: Pump System Review

SEPTIC/OWTS PERMIT (To be collected at time of Building Permit Issuance):

LU22

$2,068

  Residential Septic/OWTS Construction Permit

LU24

$2,458

  Commercial Septic/OWTS Construction Permit

LU26

$3,015

  Alternative Septic/OWTS Construction Permit (≤ 20% slope)

ADDITIONAL FEES:

LU93

$223

  File Review (hourly)

LU96

$223

  Consultation/Additional Field Time (hourly)

We will not begin any work until all the items noted above and payment are received.

Please forward all large/over-sized site-maps and necessary documents to the following:

County of Santa Clara – DEH
RE: (Project number, once assigned)
1555 Berger Drive #300
San Jose, CA  95112

©2023 County of Santa Clara. All rights reserved.