Application for Upgrade of Septic/OWTS (LU72/LU73/LU74)

​When submitting for an upgrade of a Septic/Onsite Wastewater Treatment System (OWTS) to accommodate for your proposed building project, please provide the following:

  1. A completed Land Use Service Application
  2. One (1) copy of site plans to scale (1” = 20’). Plans must include:
    1. Proposed Septic/OWTS upgrades as required
    2. Location of existing septic tank and leachfield (As-built)
    3. Scope of proposed building project
    4. Minimum setbacks as required on page 3.11 & 3.12 of the Onsite Systems Manual
    5. Any additional requirements, as detailed in the Onsite Systems Manual
  3. One (1) copy of existing and proposed floor plans (if applicable)
  4. Additional soil testing may be required to determine minimum sizing and setbacks of Septic/OWTS by completion of one or more of the following:
    1. Site assessment
    2. Soil analysis
    3. Percolation testing (completed by REHS, Professional Civil Engineer, or Professional Geologist)
  5. Current (within last 3 years) Septic Pumper’s Report including 30-minute water test if existing Septic/OWTS is to be utilized
  6. Once all requirements have been completed and plans are ready for an approval stamp, additional copies (4) will need to be submitted.

Three (3) stamped copies are to be picked up and taken to the applicable jurisdiction’s Planning/Building Department for inclusion in the building packet.

NOTE: An onsite inspection may be scheduled for verification of minimum requirements. Additional fees and requirements may apply. All applicable fees must be paid in full prior to any services provided by DEH (inspections, plan reviews, approvals, etc.). Projects/Submittals are reviewed in the order received - with the exception of septic system failures.

Image of a property with a septic treatment system being installed in the backyard.

Applicable fees:

PE

Amount

  Description

SEPTIC/OWTS FEASIBILITY:

LU01

$615

Site Assessment

LU02

$615

Soil Analysis

LU06

$894

Percolation tests (up to 6 holes) 

PLAN REVIEW:

LU08

$336

Geological Technical Report Review (if slope >20%)

LU13

$1006

Land Use Plan Check: Commercial Construction

LU15

$336

Land Use Plan Check Major Building Addition (>500 sq. ft.) and/or bedroom addition

LU16

$279

Land Use Plan Check Minor Building Addition (≤ 500 sq. ft.) with no bedroom addition

LU17

$223

Land Use Plan Check Residential Accessory Structure (Barns/Detached 

  Garage/Pool/Solar)

LU18

$223

Land Use Plan Check Resubmittal Charge

LU19

$1006

Land Use Plan Check: Pump System Review

SEPTIC/OWTS PERMIT (To be collected at time of Building Permit Issuance):

LU28

$1,229

Septic/OWTS Upgrade/Modification (> 50% of system)

LU29

$782

Septic/OWTS Upgrade/Modification (< 50% of system)

LU30

$1,229

Septic/OWTS Upgrade/Modification - Alternative System 

ADDITIONAL FEES:

LU93

$223

File Review (hourly)

LU96

$223

Consultation/Additional Field Time (hourly)

We will not begin any work until all the items noted above and payment are received.

Please forward all large/over-sized site-maps and necessary documents to the following:

County of Santa Clara – DEH
RE: (Project number, once assigned)
1555 Berger Drive #300
San Jose, CA  95112